Brand Name: HTEG
Model Number: Customized
Place of Origin: Shandong, China (Mainland)
H finned tube economizer, a kind of boiler parts, is widely used in industrial boilers, marine power, heat exchanger components.
It is a kind of boiler parts, which have two steel circular symmetry to be welded on fluorescent tubes to form fins positive shape much like letter "H"- so called H-fin tube. H-economizer widely used in utility boilers, industrial boilers, marine power, such as the tail of heat exchanger components.
1). Add the heat exchange area and reduce the number of tubes, also increase the fume flow section area to reduce the fume speed and abrasion.
2). H type fin tube can be made to double H type fin tube, high rigidness to fit long tube row.
3). H type fin economizer arranged in line to make the space into many small zones, averaged air flow to reduce the abrasion.
4). With straight channel to gain the best ash-blowing effect.
5). The compact structure to reduce the weight and reduce the manufacturing cost.
Shandong Hengtao Energy Saving & Environment Protection Co., Ltd., founded in 1995, is located in Gaomi City, Shandong Province. Hengtao Group has 470,000,000 RMB of total registered capital 1,400,000 square meter of land coverage, about 2000 employees and over 3 billion RMB of total assets.
We are one of the manufacturers of boiler and boiler parts in China. We have a team of engineers who have more than 20 years experience in designing, manufacturing, engineering, supplying of boiler and its spare parts. We manufacture CFB boiler, enameled corrugated plate, enameled tubular air preheater, rotary air preheater, H-finned economizer, spiral finned economizer, membrane water wall, header and other customized boiler parts.
Our product has won the trust have won the trust and support from our customers both at home and abroad, which have been exported to Southeast Asia, middle east and other countries.
1. Strength calculation report with applied materials information;
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler;
4. Hydraulic test report: ensure the standard working pressure and safety
We produce strictly following consumer's order. Every consumer has the chance to visit our workshop before placing the order. Welcome you to our company!
Packing Details: We have standard seaworthy package and we also could try our best to package the product to meet your requirement.
Delivery Details: We have the most reliable transportation to make sure your goods arrived your destination as soon as possible.
Q: Who are you? Trade company or manufacturer?
A: We are manufacturer.
Q: When the product can be delivered?
A: Commonly the lead time will be within 30 days after receiving 30% deposit or L/C, subject to prior sales.
Q: What's the Min order to your company?
A: 1 set. The sample order, if we have stocks, we will send out the products within 1 week.
Q: What's the advantage of your company?
A: We have exported our boilers and service to more than 50 countries. We have specialized team work for you, you will get our feedback within 12 hours./ Germany and Italian advanced manufacturing technology.